Change GL Date on a Voucher
Revision as of 12:16, 10 November 2011 by Smiller (talk | contribs) (→An Existing Voucher Will Not Allow Me to Edit the GL Date (AP10))
An Existing Voucher Will Not Allow Me to Edit the GL Date (AP10)
If you have created and saved a voucher, the system does not allow the modification of the G/L tran date field. This is because there are General Ledger transactions on the Line Items screen:
In order to update the GL date on the Voucher Setup screen, you will have to delete ALL of the line items. Once you have done so, the system will allow you to edit the voucher and change the GL transaction date.